Place of Origin: | China(Mainland) |
Brand Name: | HDT |
Certification: | ASME, GRADE A, ISO9001,ISO14001, PED |
Model Number: | Welded Tube |
Minimum Order Quantity: | 5T |
---|---|
Price: | 800 - 9000 USD / ton |
Packaging Details: | seaworthy packing for exporting |
Delivery Time: | 60-75days |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | About 10000 ton / month |
Material: | ASTM A787 | Finishing: | Annealed, Normalized, Normalized And Tempered |
---|---|---|---|
Application: | Boiler&heat Exchanger, Energy, Petrochemical, Mining, Food, Paper, Gas And Fluid Industry | Certificates: | ASME, TUV, SGS, CE, ISO9001, |
Shape: | Welded Pipe | ||
Highlight: | cs erw pipe,cold drawn steel tube |
Stable Performance Automotive Steel Tubes Welded Carbon Steel Mechanical Tubing
1. Scope*
ASTM A787 Q195 SAE1008 DX53 Welded Carbon Steel Mechanical Tubing
Introduction:
Name | Welded Carbon Steel Mechanical Tubing |
OD | 28.6-127mm |
WT | 0.8-2.5mm |
Length | Max12000mm |
Usage | mechanical components,automobile, etc |
Technics | Welded |
Section shape | Round |
Material | Q195,Q235,Q345,SAE1008,SAE1022,DX53,DX51,DC04,SA1C,etc |
Surface treatment | Polished,oiled |
Payment | T/T,L/C,Money Gram,Western Union |
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.Product show:
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
Contact Person: Mrs. Sandy
Tel: 008615151590099
Fax: 86-512-5877-4453
Hot Finished Stainless Steel Seamless Pipe Astm A312 Tp316ti B16.10 B16.19 Pe Be
Stainless Steel Seamless Heat Exchanger Pipe ASTM A213 TP310S Grade A
ASTM A312 TP316 316L Stainless Steel Seamless Pipe / Seamless Stainless Steel Tube
A269 TP316Ti Stainless Steel Seamless Pipe / U Bend Pipe 100% Hydrostatic Testing
Stainless Steel Seamless Boiler Tubes / ASTM 316 316L A312 304 Ss Tubes
34CrMo4 SS Seamless Boiler Tubes / Mechanical DIN 2391 High Pressure Hot Rolled Steel Tube
Q235B Grade St37 Seamless Cs Carbon Steel Boiler Tubes Large Diameter
SA179SMLS Carbon Steel Sa 179 Seamless Tube For High Middle Low Pressure Boiler Pressure
ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Oiled Surface
Industry Boiler Steel Tube For Heat Exchanger Condenser Cold Drawn Low Carbon
ASTM A210 Gr A Grade C Boiler Steel Tube / Power Plant Heat Exchanger Tube