Q235 Cs Carbon Steel Welded Tube Gb T8162 Thick Wall For Mechanical Structure
Product Details
| Material: | ASTM A787 | Finishing: | Annealed, Normalized, Normalized And Tempered |
|---|---|---|---|
| Application: | Boiler&heat Exchanger, Energy, Petrochemical, Mining, Food, Paper, Gas And Fluid Industry | Certificates: | ASME, TUV, SGS, CE, ISO9001, |
| Shape: | Welded Pipe | ||
| Highlight |
cs erw pipe,spiral welded steel pipe |
||
Product Description
Q235 Carbon Steel Welded Pipe Gb/t8162 Thick Wall For Mechanical Structure
GB/T8162 Q235 Welded Carbon Steel Tube for Mechanical Structure
|
carbon steel tube |
|
| Name | carbon steel tube |
| Techique | Cold Drawn |
| Standard | GB/T8162,GB/T8163,GB/T3094, ASTM A 500, ASTM A 501, ASTM A 519, JIS G3441, JIS G3444, ASTM A 53, DIN1629 and otherwise |
| Material | Carbon Steel of 20#, Q235,35#,45# ,16Mn, A53 GR.B,A106 Gr.B, ST45, CK45 |
| Alloy steel of 20Cr, 40Cr, 20CrMnTi, 20CrMo, 42CrMo,40MnMoV, | |
| Material Origin | China |
| Specification | O.D:6-102mm WT: 0.6-19mm |
| Length | random lenth or cutted size as customer required |
| shape | round,horse hoof, hexagonal,rectangular and square |
| surface | Oiled or Black painted to prevent rust |
| Min Order | 5Tons |
| Capacity | 30,000Tons/year |
| application | General and Mechanical structure, construction and liquid conveyance |
| Terms of payment | T/T in advance or L/C at sight |
| Delivery Time | 20-30 days after receving the deposite |
FAQ
How to get the sample?
1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.
What is your Payment Term?
1.T/T: 30% deposit in advance, the balance 70% paid before shipment
2.30% down payment, the balance 70% paid against L/C at sight
3.Upon negotiation
Who are your customers?
Stockists, Distributors,Wholesalors,Agents, Traders, End Users, etc
How long will you react on our requirement?
Your requirement would be treated within 24 hours on weekdays. Quotations would be sent upon technical details confirmed by customer!
Any more questions about your doubts, please feel free to send us your emails or call!
Certification


Product Highlights
Q235 Carbon Steel Welded Pipe Gb/t8162 Thick Wall For Mechanical Structure GB/T8162 Q235 Welded Carbon Steel Tube for Mechanical Structure carbon steel tube Name carbon steel tube Techique Cold Drawn Standard GB/T8162,GB/T8163,GB/T3094, ASTM A 500, ASTM A 501, ASTM A 519, JIS G3441, JIS G3444, ASTM ...
High Frequency Welding Customized Coal Fired Steam Boiler Parts Stack Economizer Coil
High Frequency Welding Customized Coal Fired Steam Boiler Parts Stack Economizer Coil Boiler economizer Boiler Economizer is the energy improving device that helps to reduce the cost of operation by saving the fuel. The economizer in Boiler tends to make the system more energy efficient. In boilers, economizers are generally designed to exchange heat with the fluid, generally water. The exhaust from the boilers is generally in the temperature range of 200°C – 250°C, so there
High Frequency Welding Boiler Spiral Fin Tube For Economizer Heat Transfer
High Frequency Welding Boiler Spiral Fin Tube For Economizer Heat Transfer Boiler economizer Boiler Economizer is the energy improving device that helps to reduce the cost of operation by saving the fuel. The economizer in Boiler tends to make the system more energy efficient. In boilers, economizers are generally designed to exchange heat with the fluid, generally water. The exhaust from the boilers is generally in the temperature range of 200°C – 250°C, so there are a huge
Heat Exchanger H Type Boiler Parts Tube For Utility Power Station Plant
High Efficient Heat Exchang H Type High Temperature Resistance Boiler Parts For Utility/Power Station Plant Product Introduce H-fin Tubes have two steel discs,with fluorescent tubes symmetrically welded together to form fins(fins of butterfly piece)creating a shape that looks somewhat like the letter"H",creating an efficient energy saving, extension heating surface.H-fin Tubes also have a high rate of fusion welds and weld tensile strength.H-fin Tube is assembled with the H
Extension Heating Surface Boiler Fin Tube For Industrial Power Plant Boiler
Energy Saving Extension Heating Surface Boiler Fin Tube For Industrial Power Plant Boiler Product Description H-fin Tubes have two steel discs,with fluorescent tubes symmetrically welded together to form fins(fins of butterfly piece)creating a shape that looks somewhat like the letter"H",creating an efficient energy saving, extension heating surface. H-fin Tubes also have a high rate of fusion welds and weld tensile strength.H-fin Tube is assembled with the H economizer,
Please use our online inquiry contact form below if you have any questions, our team will get back to you as soon as possible.