logo
ZHANGJIAGANG HUA DONG ENERGY TECHNOLOGY CO.,LTD

Zhangjiagang Hua Dong Energy Technology Co., Ltd.

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Home ProductsBoiler Fin Tube

High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station

High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station

  • High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station
  • High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station
  • High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station
  • High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station
  • High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station
  • High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station
High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station
Product Details:
Place of Origin: Jiangsu, China
Brand Name: Hua Dong
Payment & Shipping Terms:
Minimum Order Quantity: 20
Price: $1,800-2,000
Contact Now
Detailed Product Description
Type: Natural Circulation Structure: Water Tube
Pressure: High Pressure Steam Production: Max. 20t/h
Style: Horizontal Fuel: Coal-fired
Output: Hot Water Material: Special Boiler Steel Plate
Thermal Efficiency: 92.4%--94.5% Fuel Type: Coke Oven Gas
Working Pressure: High Pressure Operation: Fully Automatic Control
Weight: 5~50ton Base Pipe: Welded Or Seamless
Pipe Material: Carbon Steel, Alloy Steel, Stainless Steel, Non-ferrous Alloys And Nickel Alloys
Highlight:

High Pressure Boiler Fin Tube

,

High Safety Level Boiler Fin Tube

,

3 Years Warranty Boiler Fin Tube

ISO ASME Boiler Spiral / H Type Fin Tube for Power Plant Serrated Solid
Product Description
H-fin Tubes feature two steel discs with fluorescent tubes symmetrically welded together to form fins (butterfly piece fins), creating an H-shaped profile. This design offers efficient energy savings and extends the heating surface area. H-fin Tubes provide high fusion weld rates and superior weld tensile strength. When assembled with H economizers, they deliver high efficiency, minimal resistance, reduced wear, and lightweight performance.
Product H-fin Tube
Base Pipe Welded or Seamless
Material Carbon steel, alloy steel, stainless steel, non-ferrous alloys and nickel alloys
Application Economizer, Evaporator, Superheater, Air heater and more
Structure
Our H-fin tubes are custom-designed to meet specific customer requirements and operational conditions. We engineer safe, reliable, and efficient solutions with high heat transfer efficiency. HD BOILER maintains comprehensive quality assurance systems, producing H-fin tubes with optimized flue gas resistance and compact spatial design.
Similar Product
High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station 0
Our Company
High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station 1
Certifications
High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station 2
Packing and Shipping
High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station 3
FAQ
High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station 4
Contact Us
Please feel free to contact us for any questions or requirements.
Address: No.1 Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Tel: +86 (0) 512 5866 6196
Fax: +86 (0) 512 5877 4453
Web: www.boilerfabrication.com
High Pressure Boiler Fin Tube with High Safety Level and 3 Years Warranty for Power Station 5

Contact Details
ZHANGJIAGANG HUA DONG ENERGY TECHNOLOGY CO.,LTD

Contact Person: Mrs. Sandy

Tel: 008615151590099

Fax: 86-512-5877-4453

Send your inquiry directly to us (0 / 3000)

Other Products