logo
ZHANGJIAGANG HUA DONG ENERGY TECHNOLOGY CO.,LTD

Zhangjiagang Hua Dong Energy Technology Co., Ltd.

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Home ProductsSerpentine Tube

ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application

ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application

  • ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application
  • ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application
  • ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application
  • ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application
  • ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application
  • ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application
ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application
Product Details:
Payment & Shipping Terms:
Minimum Order Quantity: 20
Price: 8000
Contact Now
Detailed Product Description
Model NO.: HDB Surface Treatment: Painted
Fuel: Coal Type: Coal-Fired
Structure: Water Tube Style: Horizontal
Design Standard: ASME Transport Package: Iron Frame
Diameter (OD): 76mm~914mm Length (Max): 23000mm
Temperature: 300~1500ºC Production Capacity: 500ton/Months
Material Inspection: 100% NDT Welding Inspection: X-ray, γ-ray, Liquid Penetrant
Pressure Test: Hydraulic Test
Highlight:

ASME Design Standard Manifold Header Boiler Tube

,

Customized Specification Serpentine Tube

,

Power Station Application Boiler Header

Power Plant Boiler Parts Manifold Header Boiler Tube
To improve boiler efficiency, header boilers have evolved into tube boilers to increase heat transfer area. Water flows from the drum to the lower box via the downcomer, distributing to each tube bundle through the box. The water in these tube bundles continuously absorbs thermal energy before returning to the drum after collection in the upper header. These upper and lower headers are critical boiler components.
ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application 0
Technical Specifications
Diameter (OD) ¢76mm ~ ¢914mm
Length (Max) 23000mm
Temperature Range 300°C ~ 1500°C
Brand Hua Dong Boiler
ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application 1
Company Profile
Zhangjiagang Hua Dong Boiler Co., Ltd., established in 1985, specializes in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers, and related heating surface components. The company provides comprehensive services from design and manufacturing to installation and maintenance.
Manufacturing Advantages
38 years of industry experience in research, development, and manufacturing with substantial production capacity.
Quality Control System
  • Impact test and strength calculation reports with applied materials information
  • 100% NDT (non-destructive inspection) reports for steel plate, tube, and electrode
  • X-ray, γ-ray, and liquid penetrant test inspection reports for welding seams
  • Hydraulic test reports to ensure standard working pressure and safety
Complete quality assurance and control system certified according to International Quality Standards. We maintain strict compliance with national regulations, standards, and technical requirements, ensuring 100% process and product quality control through stringent inspection and testing throughout manufacturing.
Certifications
ISO 9001: 2015; CE Certificate; EN ISO 3834-2; ASME Certificate with "S", "U" and "NB" Stamps
ASME Design Standard Manifold Header Boiler Tube with Customized Specification for Power Station Application 2
Frequently Asked Questions
How long is the warranty period?
We provide 18 months warranty for all spare parts (excluding fragile parts).
How can we guarantee quality?
  • All machines strictly comply with ISO quality and CE system requirements
  • Each procedure is crafted by professional skilled labor, followed by particular QC
  • All product information can be checked in our efficient management system
What can you buy from us?
CFB Boiler, HRSG Boiler, Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall, Boiler manifold headers and other pressure spare parts.
What kind of service do you provide?
Before Sales:
Product information, market research forecasting, product customization, product processing, consultation and other convenience services.
After Sales:
  • Technical training according to customer requirements
  • Replacement guarantee under warranty
  • Maintenance spare parts supply
  • Regular customer callbacks and visits
  • Prompt response to complaints and consultations
Delivery Terms: FOB, CFR, CIF, EXW, FCA
Payment Currency: USD, CNY
Payment Types: T/T, L/C, MoneyGram, Western Union, Cash
Languages: English, Chinese
Are you a factory or trading company, where are you located?
We are a factory located just 130km (2 hours by car) from Shanghai Airport. We offer pickup service at Shanghai for customer visits.

Contact Details
ZHANGJIAGANG HUA DONG ENERGY TECHNOLOGY CO.,LTD

Contact Person: Mrs. Sandy

Tel: 008615151590099

Fax: 86-512-5877-4453

Send your inquiry directly to us (0 / 3000)

Other Products