Low Energy Consumption Corrosion Proof Boiler Finned Tubes
High-efficiency heat transfer systems featuring corrosion-resistant finned tubes designed for optimal performance and energy savings.
Product Specifications
| Parameter |
Range |
Material Options |
| Base Tube O.D. (mm) |
25.4 - 1600mm |
Carbon Steel, Alloy Steel, Stainless Steel |
| Base Tube Thickness (mm) |
2.5 - 40mm |
| Fin Height (mm) |
0.5 - 20.0mm |
| Fin Thickness (mm) |
0.5 - 3.0mm |
| Fin Pitch (mm) |
5 - 25.4mm |
| Length |
0 < L < 12000mm |
|
H-Fin Tube Details
| Product Type |
H-fin Tube |
| Base Pipe |
Welded or Seamless |
| Material |
Carbon steel, alloy steel, stainless steel, non-ferrous alloys and nickel alloys |
| Applications |
H economizer, H evaporator, H superheater, H air heater and related systems |
Product Introduction
Boiler economizers are advanced heat exchange devices featuring finned tubes that efficiently heat liquids while maintaining temperatures below boiling points. We specialize in manufacturing three distinct economizer types: bare tube economizers, H finned tube economizers, and spiral finned tube economizers.
The H-finned tube economizer represents a high-efficiency heat exchange solution constructed from specialized H-finned tubes. Compared to traditional bare tube economizers, this design significantly expands the heat exchange surface area while reducing the total number of tubes required. This configuration also increases flue gas flow area, effectively reducing flow velocity and minimizing abrasion.
H-finned tubes can be manufactured as double H finned tubes, providing enhanced rigidity suitable for extended tube row applications. The spiral finned economizer incorporates a newly engineered design utilizing spiral fin tubes to address issues of severe abrasion and extend service life.
System Functionality
The primary function of the economizer is to optimize energy efficiency and reduce operational costs. By enabling compressor shutdown while maintaining adequate cooling capacity, significant energy savings are achieved.
Boiler Economizer Specifications
| Description |
Boiler economizer |
| Material |
Alloy steel, Carbon steel, SA210C, SA213T22, etc. |
| Material Standard |
ASTM, EN or ISO etc. |
| Dimension |
Customized to requirements |
| Weight Range |
Minimum: 10 tons, Maximum: 1000 tons |
| Smelting Process |
EF+LF+VD |
| Manufacturing Process |
Material → Ingot → Hot/Cold-Rolling → Heat treatment (Normalizing+ tempering) → Inspection → Rough machining → UT → Second Heat treatment → Finishing machining → Final Inspection |
| UT Standard |
ASTM A388 or EN10228, etc. |
Company Profile
Established in 1985, Zhangjiagang Hua Dong Boiler Co., Ltd. specializes in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components. We provide comprehensive integrated services spanning design, manufacturing, installation, and maintenance.
Our Advantages
38 years of dedicated industry research, development and manufacturing with substantial production capacity
Quality Control Standards
- Impact test and Strength calculation reports with comprehensive materials documentation
- 100% NDT (non-destructive inspection) reporting for steel plate, tube, and electrode materials
- X-ray, γ-ray and liquid penetrant test inspection reports for welding seams to ensure complete boiler quality
- Hydraulic test reporting to verify standard working pressure and safety compliance
We maintain a comprehensive quality assurance and control system certified according to International Quality Standards. Our quality assurance system strictly complies with national regulations, standards, and technical requirements, ensuring 100% process and product quality control. All products undergo stringent inspection and testing throughout manufacturing to guarantee faithful adherence to contract requirements, national regulations, and standards.
Certifications
Our verification certificates include: ISO 9001: 2015; CE certificate; EN ISO 3834-2; ASME certificate with "S", "U" and "NB" stamps, and other relevant industry certifications.
Global Sales Distribution
Frequently Asked Questions
How long is the warranty period?
We provide an 18-month warranty for all spare parts (excluding fragile components).
How can we guarantee quality?
- All equipment strictly complies with ISO quality and CE system requirements
- Each manufacturing procedure is executed by professional skilled labor under specific quality control protocols
- Comprehensive product information accessible through our efficient management system
What can you buy from us?
CFB Boiler, HRSG Boiler, Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall, Boiler manifold headers and other pressure spare parts.
What kind of service do you provide?
Before Sales:
Product information, market research forecasting, product customization, product processing, consultation and related support services
After Sales:
- Technical training tailored to customer requirements
- Warranty replacement commitments
- Maintenance spare parts supply
- Regular customer callbacks and visits
- Prompt response to all communications, complaints, and consultations
Accepted Delivery Terms: FOB, CFR, CIF, EXW, FCA
Accepted Payment Currency: USD, CNY
Accepted Payment Types: T/T, L/C, MoneyGram, Western Union, Cash
Languages Spoken: English, Chinese
Are you a factory or trading company, where are you located?
We operate as a manufacturing facility located just 130km (approximately 2 hours by car) from Shanghai Airport. We provide complimentary pickup service from Shanghai for customer visits.